Street Rehab Plan Construction Notice

2021 City of Grove Street Rehab Plan Construction Notice 

This Notice is to advise you that construction operations will begin on September 20, 2021 on the following streets:

  • Sumac Road        E 13th St to E 18th St

Full removal and reconstruction operations will begin on Sumac Road on September 20, 2021. During this time the roadway will be closed to through traffic with all residences and business entrances remaining accessible during construction operations. Please use extreme caution and respect any construction signage during this time. 

  • Buffalo Dr
  • Buffalo Ln
  • Pine Dr

​Asphalt repair and overlay operations will begin on the above streets September 20, 2021. During construction operations, the roadways will remain open. Please use extreme caution and respect any construction signage during this time. 

For questions or concerns contact:

Doug Frossard                    417.456.0647

Ryan Linton                         417.592.7707